Violation Detail
Standard Cited: 19260850 A Preparatory operations.
Inspection Nr: 1020076.015
Citation: 01002
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $7,000.00
Current Penalty: $7,000.00
Issuance Date: 07/15/2015
Nr Instances: 1
Nr Exposed: 5
Abatement Date:
Gravity: 10
Report ID: 0522000
Contest Date:
Final Order: 07/15/2015
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 07/15/2015 | $7,000.00 | Serious | ||
| Penalty | I: Informal Settlement | 07/15/2015 | $7,000.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.850(a): Prior to permitting employees to start demolition operations, an engineering survey shall be made, by a competent person, of the structure to determine the condition of the framing, floors, and walls, and possibility of unplanned collapse of any portion of the structure. Any adjacent structure where employees may be exposed shall also be similarly checked. The employer shall have in writing evidence that such a survey has been performed. On or about January 19, 2015 the engineering survey for the demolition of the Hopple Street Ramp D Bridge was inadequate in that is did not account for the fact that it was a double hinged bridge.