Violation Detail
Standard Cited: 19100179 N03 III B Overhead and gantry cranes.
Inspection Nr: 1015016.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,300.00
Current Penalty: $5,040.00
Issuance Date: 03/19/2015
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 03/29/2015
Gravity: 10
Report ID: 0522300
Contest Date:
Final Order: 03/26/2015
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/26/2015 | $5,040.00 | 03/29/2015 | Serious | |
| Penalty | Z: Issued | 03/19/2015 | $6,300.00 | 03/29/2015 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.179(n)(3)(iii)(b): During hoisting, the load contacted obstructions: On or about November 15, 2014 an employee utilizing the Ely Shepard Niles 3 ton crane (serial number 14056), lifted a die block cavity without the load being cleared of obstructions. The cavity bolts were still present in the large die when the load was lifted.
Translate