Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 1013830.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,000.00
Current Penalty: $2,000.00
Issuance Date: 05/29/2015
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 06/04/2015
Gravity: 5
Report ID: 0214700
Contest Date:
Final Order: 08/10/2015
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 05/29/2015 | $2,000.00 | 06/04/2015 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) a) Worksite, 11 Cherry Lane Kings Point NY - Employees were installing brick on a residential home while working from a fabricated frame scaffold. Employees were working from areas of the scaffold which were not fully planked; on or about 12/12/14. Note: The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.
Translate