Violation Detail
Standard Cited: 19100106 E06 II Flammable liquids.
Inspection Nr: 1012612.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,900.00
Current Penalty: $2,940.00
Issuance Date: 05/06/2015
Nr Instances: 3
Nr Exposed: 4
Abatement Date: 06/30/2015
Gravity: 10
Report ID: 0524530
Contest Date:
Final Order: 06/01/2015
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/01/2015 | $2,940.00 | 06/30/2015 | Serious | |
Penalty | Z: Issued | 05/06/2015 | $4,900.00 | 05/12/2015 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.106(e)(6)(ii): Category 1 or 2 flammable liquids, or Category 3 flammable liquids with a flashpoint below 100 °F (37.8 °C), were dispensed into containers without the containers being electrically interconnected. In the spray painting area, paint containers were not grounded/bonded while flammable paints were utilized and dispensed: a.) BB-99 Black Bituminous Pipe Coating (flammable paint) was dispensed from a 55-gallon drum into 5-gallon containers without proper bonding between containers. b.) BB-99 Black Bituminous Pipe Coating (flammable paint) was dispensed from a 55-gallon drum into 5-gallon containers and the 55-gallon drum was not grounded.