Violation Detail
Standard Cited: 19100147 C05 II D The control of hazardous energy (lockout/tagout).
Inspection Nr: 1012558.015
Citation: 01002
Citation Type: Serious
Abatement Date: 05/07/2015 2
Initial Penalty: $2,805.00
Current Penalty: $1,963.50
Issuance Date: 04/23/2015
Nr Instances: 6
Nr Exposed: 12
Related Event Code (REC):
Gravity: 1
Report ID: 0521100
Contest Date:
Final Order: 05/11/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/11/2015 | $1,963.50 | 05/07/2015 | Serious | |
Penalty | Z: Issued | 04/23/2015 | $2,805.00 | 05/07/2015 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(5)(ii)(D): Lockout devices and tagout devices did not indicate the identity of the employee applying the device(s): a) On or about 12/11/2014 lockout devices were observed in place in building #1 basement below #1 boiler on gas line valves. The tags being used with the locks did not identify the employee who placed the locks on the system. b) On or about 12/11/2014 locks were observed being used on valve lockout devices for bleach lines on the 2nd level of the Water treatment building. The boiler house locks did not have any identification on them regarding who had placed the locks in place or what the purpose was for the lockout. c) On or about 12/10/2014 locks were applied for #5 PM Broke Chest Pump and Felt Box Pump without the identity of the employee who placed the locks on the disconnects.