Violation Detail
Standard Cited: 19100147 C07 I B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1010174.015
Citation: 01002
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $3,700.00
Issuance Date: 05/20/2015
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 06/16/2015
Gravity:
Report ID: 0626300
Contest Date:
Final Order: 06/12/2015
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/12/2015 | $3,700.00 | 06/16/2015 | Other | |
| Penalty | Z: Issued | 05/20/2015 | $7,000.00 | 06/16/2015 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(7)(i)(B): Affected employees were not instructed in the purpose and use of the energy control procedure: On November 22, 2014, affected employees had not been instructed in the purpose and use of the energy control procedures for equipment including, but not limited to, the 9-inch press line.
Translate