Violation Detail
Standard Cited: 19100036 B04 Design and construction requirements for exit routes.
Inspection Nr: 100986231
Citation: 01002
Citation Type: Serious
Abatement Status: X
Initial Penalty: $250.00
Current Penalty: $250.00
Issuance Date: 04/06/1990
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 04/11/1990
Gravity: 05
Report ID: 0111100
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
Translate