Violation Detail
Standard Cited: 19100036 B04 Design and construction requirements for exit routes.
Inspection Nr: 100559764
Citation: 01002
Citation Type: Serious
Abatement Status: X
Initial Penalty: $300.00
Current Penalty: $100.00
Issuance Date: 01/30/1989
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 02/02/1989
Gravity: 06
Report ID: 0214700
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 02/21/1989 | $100.00 | 02/02/1989 | Serious | |
| Penalty | Z: Issued | 01/30/1989 | $300.00 | 02/02/1989 | Serious |
Translate