Violation Detail
Standard Cited: 19100036 B04 Design and construction requirements for exit routes.
Inspection Nr: 100556034
Citation: 01002
Citation Type: Serious
Abatement Status: X
Initial Penalty: $640.00
Current Penalty: $640.00
Issuance Date: 02/14/1989
Nr Instances: 2
Nr Exposed: 9
Abatement Date: 02/17/1989
Gravity: 08
Report ID: 0214700
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
Translate