Violation Detail
Standard Cited: 19100269 O02 II Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1003042.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $7,000.00
Issuance Date: 04/10/2015
Nr Instances: 2
Nr Exposed: 5
Abatement Date: 11/30/2015
Gravity: 10
Report ID: 0419700
Contest Date:
Final Order: 05/07/2015
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/07/2015 | $7,000.00 | 11/30/2015 | Serious | |
Penalty | Z: Issued | 04/10/2015 | $7,000.00 | 05/28/2015 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.269(o)(2)(ii): Employees were not trained in safe work practices upon their initial assignment to the test area, with periodic reviews and updates provided as required by paragraph (a)(2) of this section: a. On or about October 13, 2014, at the Reddick Substation, employees assisting with Doble testing were not trained in safe work practices required for high voltage Doble transformer testing, and they had not received periodic reviews or updates. b. On or about October 15, 2014, at the Reddick Substation, employees assisting with Doble testing were not trained in safe work practices required for high voltage Doble transformer testing, and they had not received periodic reviews or updates.