Violation Detail
Standard Cited: 19100217 E01 I Mechanical power presses.
Inspection Nr: 1713540.015
Citation: 01001J
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,687.00
Current Penalty: $0.00
Issuance Date: 05/14/2024
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 03/03/2025
Gravity: 5
Report ID: 0316700
Contest Date: 06/14/2024
Final Order: 02/10/2025
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 02/10/2025 | $0.00 | 03/03/2025 | Serious | |
Penalty | C: Contested | 07/08/2024 | $3,687.00 | 06/10/2024 | Serious | |
Penalty | Z: Issued | 05/14/2024 | $3,687.00 | 06/10/2024 | Serious |
Text For Citation: 01 Item/Group: 001J Hazard:
29 CFR 1910.217(e)(1)(i): A program of periodic and regular inspections of mechanical power presses was not established and followed to ensure that all parts, auxiliary equipment and safeguards were in a safe operating condition and adjustment: (a) PSS Manufacturing Company Inc., 405 School Road, Denver, Pennsylvania - The employer had various mechanical power presses, including, but not limited to, the Bliss mechanical power press referred to as the coining press, the 125-ton Federal Press No. 10 mechanical power press, the 90-ton Bliss 21 B mechanical power press, and the 75-ton Version, model G2-75-46-28, serial number 13139, mechanical power press, and the employer did not establish and follow a program of periodic and regular inspections of the mechanical power presses, exposing employees to hazards including caught-in and struck-by, on or about November 30, 2023. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and state employees and their representatives were informed of this abatement.