Violation Detail
Standard Cited: 19100217 B06 I Mechanical power presses.
Inspection Nr: 1713540.015
Citation: 01001G
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,687.00
Current Penalty: $0.00
Issuance Date: 05/14/2024
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 03/03/2025
Gravity: 5
Report ID: 0316700
Contest Date: 06/14/2024
Final Order: 02/10/2025
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 02/10/2025 | $0.00 | 03/03/2025 | Serious | |
Penalty | C: Contested | 07/08/2024 | $3,687.00 | 06/10/2024 | Serious | |
Penalty | Z: Issued | 05/14/2024 | $3,687.00 | 06/10/2024 | Serious |
Text For Citation: 01 Item/Group: 001G Hazard:
29 CFR 1910.217(b)(6)(i): Two hand trips on mechanical power presses using full revolution clutches did not have the individual operator's hand controls protected against unintentional operation and did not have the individual operator's hand controls arranged by design and construction to require concurrent operation of the individual operator's hand controls: (a) Fabrication Area - The Bliss mechanical power press referred to as the coining press had a single-hand trip control rather than a two-hand trip control, and the single-hand trip control did not have protection against unintended operation, exposing employees to getting caught-in or struck-by the closing die, on or about November 30, 2023. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and shall state that employees and their representatives were informed of this abatement.