Violation Detail
Standard Cited: 19100333 B02 IV B Selection and use of work practices
Inspection Nr: 1479508.015
Citation: 01001G
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 11/25/2020
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 12/22/2020
Gravity: 10
Report ID: 0626700
Contest Date:
Final Order: 01/12/2021
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/12/2021 | $0.00 | 12/22/2020 | Serious | |
Penalty | Z: Issued | 11/25/2020 | $0.00 | 12/22/2020 | Serious |
Text For Citation: 01 Item/Group: 001G Hazard:
29 CFR 1910.333(b)(2)(iv)(B): Before circuits or equipment was worked as deenergized, a qualified person did not use test equipment to test the circuit elements and electrical parts of equipment to which employees would be exposed and did not verify that the circuit elements and equipment parts were de-energized: a) At the worksite, a qualified person did not use test equipment to test the circuit elements and electrical parts of a Carrier Model 50TC-A06A2A6A0A0A0 480-volt HVAC unit Serial Number 5114C89522, to which employees were exposed and did not verify that the circuit elements and equipment parts of the HVAC unit were de-energized.