Violation Detail
Standard Cited: 19100106 E09 III Flammable liquids.
Inspection Nr: 1711543.015
Citation: 01001E
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/03/2024
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 06/20/2024
Gravity: 10
Report ID: 0112300
Contest Date:
Final Order: 05/24/2024
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/24/2024 | $0.00 | 06/20/2024 | Serious | |
Penalty | Z: Issued | 05/03/2024 | $0.00 | 06/20/2024 | Serious |
Text For Citation: 01 Item/Group: 001E Hazard:
29 CFR 1910.106(e)(9)(iii): Combustible waste material and residues in a building or unit operating area were not kept to a minimum, stored in covered metal receptacles and disposed of daily. Monarch Metal Finishing Co., Inc. at 189 Georgia Avenue in Providence, RI: a.) On or about November 21, 2023, in the flammable storage room and throughout the lacquer work area room, combustible waste, including but not limited to cardboard boxes, were allowed to accumulate in the lacquer work area room, without being disposed of daily.