Violation Detail
Standard Cited: 19100147 D The control of hazardous energy (lockout/tagout).
Inspection Nr: 1748502.015
Citation: 01001D
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,334.00
Current Penalty: $0.00
Issuance Date: 09/06/2024
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 10/02/2024
Gravity: 5
Report ID: 0522000
Contest Date:
Final Order: 09/25/2024
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/25/2024 | $0.00 | 10/02/2024 | Serious | |
Penalty | Z: Issued | 09/06/2024 | $9,334.00 | 10/02/2024 | Serious |
Text For Citation: 01 Item/Group: 001D Hazard:
29 CFR 1910.147(d): Application of control. The established procedures for the application of energy control (the lockout or tagout procedures) shall cover the following elements and actions and shall be done in the following sequence: (3) Machine or equipment isolation. All energy isolating devices that are needed to control the energy to the machine or equipment shall be physically located and operated in such a manner as to isolate the machine or equipment from the energy source(s). (4) Lockout or tagout device application. (4)(i) Lockout or tagout devices shall be affixed to each energy isolating device by authorized employees. (5) Stored energy. (i) Following the application of lockout or tagout devices to energy isolating devices, all potentially hazardous stored or residual energy shall be relieved, disconnected, restrained, and otherwise rendered safe. (d)(6) Verification of isolation. Prior to starting work on machines or equipment that have been locked out or tagged out, the authorized employee shall verify that isolation and deenergization of the machine or equipment have been accomplished. a) On or about 05/08/2024, the employer did not ensure that each authorized employee troubleshooting a stuck shim pack on the R2 01.20 Feed Compressor in the R2 compressor room performed (d3-d6) of the requirements to ensure all energy sources such as gas valves (discharge, suction, and recycle) were secure with padlocks and chains and that the contractor's employee had added a lockout device to the electrical disconnect for the feed compressor.