Violation Detail
Standard Cited: 19100147 D04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1646771.015
Citation: 01001D
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $12,500.00
Issuance Date: 05/31/2023
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 06/29/2023
Gravity: 10
Report ID: 0523900
Contest Date: 06/27/2023
Final Order: 12/08/2023
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 12/08/2023 | $12,500.00 | 06/29/2023 | Other | |
| Penalty | C: Contested | 06/27/2023 | $0.00 | 06/29/2023 | Serious | |
| Penalty | Z: Issued | 05/31/2023 | $0.00 | 06/29/2023 | Serious |
Text For Citation: 01 Item/Group: 001D Hazard:
29 CFR 1910.147(d)(4)(i): Lockout or tagout devices were not affixed to each energy isolating device by authorized employees: (a) Plant 2 sub-finishing department, glue roller press; On or about January 23, 2023 and on dates prior, the 2D320 Press Roller was not secured from the electrical energy source during setup and cleaning activities, in that the main power cord was not placed in an appropriate plug cap and secured with a lock.
Translate