Violation Detail
Standard Cited: 19100333 A01 Selection and use of work practices
Inspection Nr: 1479508.015
Citation: 01001D
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,446.00
Current Penalty: $0.00
Issuance Date: 11/25/2020
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 12/31/2020
Gravity: 10
Report ID: 0626700
Contest Date:
Final Order: 01/12/2021
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 01/12/2021 | $0.00 | 12/31/2020 | Serious | |
| Penalty | Z: Issued | 11/25/2020 | $9,446.00 | 12/31/2020 | Serious |
Text For Citation: 01 Item/Group: 001D Hazard:
29 CFR 1910.333(a)(1): Live parts to which an employee may be exposed were not deenergized before an employee worked on or near them: a) At the worksite, the electrical parts of a Carrier Model 50TC-A06A2A6A0A0A0 480-volt HVAC unit Serial Number 5114C89522 were not deenergized before employees worked near them.
Translate