Violation Detail
Standard Cited: 19100147 C07 I B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1224004.015
Citation: 01001D
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/14/2017
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 11/01/2017
Gravity: 5
Report ID: 0214700
Contest Date:
Final Order: 09/26/2017
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/26/2017 | $0.00 | 11/01/2017 | Serious | |
| Penalty | Z: Issued | 09/14/2017 | $0.00 | 11/01/2017 | Serious |
Text For Citation: 01 Item/Group: 001D Hazard:
29 CFR 1910.147(c)(7)(i)(B): Each affected employee shall be instructed in the purpose and use of the energy control procedure. a) Worksite: Employees are required to provide repair and maintenance on equipment such as, but not limited to an Otto Martin Maschinebau T26 Router , Otto Martin Maschinebau T72 Table Saw , and a Sicma DT530 Plainer. The employees were not provided with Lockout/Tagout training; on or about 4/11/17. Note: The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.
Translate