Violation Detail
Standard Cited: 19100107 E05 Spray finishing using flammable and combustible materials.
Inspection Nr: 1809050.015
Citation: 01001C
Citation Type: Serious
Abatement Status:
Initial Penalty: $12,768.00
Current Penalty: $0.00
Issuance Date: 07/28/2025
Nr Instances: 3
Nr Exposed: 11
Abatement Date: 09/30/2025
Gravity: 5
Report ID: 0627700
Contest Date:
Final Order: 09/02/2025
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/02/2025 | $0.00 | 09/30/2025 | Serious | |
Penalty | Z: Issued | 07/28/2025 | $12,768.00 | 08/14/2025 | Serious |
Text For Citation: 01 Item/Group: 001C Hazard:
29 CFR 1910.107(e)(5): Containers supplying spray nozzles were not of closed type or provided with metal covers kept closed. Containers under air pressure supplying spray nozzles were not provided with a visible pressure gage: a.) On or about March 6, 2025 and at times prior, in the south paint shop, containers under air pressure supplying spray nozzles were not provided with a visible pressure gauge. b.) On or about March 6, 2025 and at times prior, in the north paint shop, containers supplying spray nozzles were not provided with metal covers kept closed. c.) On or about March 6, 2025 and at times prior, in the south paint shop, containers supplying spray nozzles were not provided with metal covers kept closed.