Violation Detail
Standard Cited: 19100269 C01 II Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1691855.015
Citation: 01001C
Citation Type: Serious
Abatement Date: 01/05/2024 5
Initial Penalty: $4,688.00
Current Penalty: $0.00
Issuance Date: 12/08/2023
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity: 10
Report ID: 0626300
Contest Date:
Final Order: 01/04/2024
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/04/2024 | $0.00 | 01/05/2024 | Serious | |
Penalty | Z: Issued | 12/08/2023 | $4,688.00 | 01/05/2024 | Serious |
Text For Citation: 01 Item/Group: 001C Hazard:
29 CFR 1910.269(c)(1)(ii): The employer did not ensure that the employee in charge conducted a job briefing that met paragraphs (c)(2) though (c)(4) of this section with the employees involved before they start each job: a) On or about August 17, 2023, and at times prior thereto, employees who were performing line clearance were not briefed on hazards associated with the job, work procedures involved, special precautions, energy-source controls, and personal protective equipment requirements.