Violation Detail
Standard Cited: 19260251 B06 I Rigging equipment for material handling.
Inspection Nr: 1674912.015
Citation: 01001C
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,162.00
Current Penalty: $0.00
Issuance Date: 11/20/2023
Nr Instances: 2
Nr Exposed: 4
Abatement Date: 12/19/2023
Gravity: 5
Report ID: 0636900
Contest Date:
Final Order: 12/13/2023
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/13/2023 | $0.00 | 12/19/2023 | Serious | |
Penalty | Z: Issued | 11/20/2023 | $11,162.00 | 12/19/2023 | Serious |
Text For Citation: 01 Item/Group: 001C Hazard:
29 CFR 1926.251(b)(6)(i): In addition to the inspection required by other paragraphs of this section, a thorough periodic inspection of alloy steel chain slings in use was not made on a regular basis and without consideration of severity and service conditions: On or about June 5, 2023, and at times prior thereto, at the utility construction jobsite, the employer did not adequately ensure alloy steel slings were periodically inspected based on severity of service conditions potentially exposing employees to crush-by and/or struck-by hazards.