Violation Detail
Standard Cited: 19100146 C07 III Permit-required confined spaces
Inspection Nr: 1661603.015
Citation: 01001C
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/29/2023
Nr Instances: 2
Nr Exposed: 5
Abatement Date: 09/25/2023
Gravity: 5
Report ID: 0317900
Contest Date:
Final Order: 09/21/2023
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/21/2023 | $0.00 | 09/25/2023 | Serious | |
| Penalty | Z: Issued | 08/29/2023 | $0.00 | 09/25/2023 | Serious |
Text For Citation: 01 Item/Group: 001C Hazard:
29 CFR 1910.146(c)(7)(iii):The employer did not document the basis for determining that all hazards in a permit space had been eliminated, through a written certification that contained the date, the location of the space, and the signature of the person involved: a) Facility (Brew Kettle area) - On or about April 6, 2023, the employer did not document the basis for determining that all hazards in a permit space had been eliminated in accordance with this section. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.