Violation Detail
Standard Cited: 19100147 D03 The control of hazardous energy (lockout/tagout).
This violation item has been deleted.
Inspection Nr: 1546430.015
Citation: 01001C
Citation Type: Serious
Abatement Status:
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/21/2021
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 10/08/2021
Gravity: 5
Report ID: 0316400
Contest Date:
Final Order: 11/22/2021
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/22/2021 | $0.00 | 10/08/2021 | Serious | |
| Penalty | Z: Issued | 09/21/2021 | $0.00 | 10/08/2021 | Serious |
Text For Citation: 01 Item/Group: 001C Hazard:
29 CFR 1910.147(d)(3): All energy isolating devices that were needed to control the energy to the machine or equipment were not physically located and operated in such a manner as to isolate the machine or equipment from the energy source(s): (a) Fence Department: On July 30, 2021, maintenance employees authorized to conduct energy isolation procedures did not de-energize the Fence Machine Panel Stacker using the energy isolating device prior to conducting maintenance activities.