Violation Detail
Standard Cited: 19100333 B02 IV B Selection and use of work practices
This violation item has been deleted.
Inspection Nr: 1515212.015
Citation: 01001C
Citation Type: Serious
Abatement Status:
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/06/2021
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 08/18/2021
Gravity: 10
Report ID: 0523400
Contest Date: 08/30/2021
Final Order: 01/03/2022
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 01/03/2022 | $0.00 | 08/18/2021 | Serious | |
| Penalty | C: Contested | 09/01/2021 | $0.00 | 08/18/2021 | Serious | |
| Penalty | Z: Issued | 08/06/2021 | $0.00 | 08/18/2021 | Serious |
Text For Citation: 01 Item/Group: 001C Hazard:
29 CFR 1910.333(b)(2)(iv)(B): Before circuits or equipment was worked as deenergized, a qualified person did not use test equipment to test the circuit elements and electrical parts of equipment to which employees would be exposed. (a) On or about February 13, 2021, employee(s) performing electrical work on or around the Russelectric 15,000 volt ATS #2 circuit breaker did not test the electrical circuit to insure that it was in a de-energized state prior to conducting work on the 13,200 volt AC circuit. This exposed employee(s) working at or around the circuit breaker to Arc-flash, electrical shock, and burns.