Violation Detail
Standard Cited: 19100333 B02 Selection and use of work practices
Inspection Nr: 1439444.015
Citation: 01001C
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,304.00
Current Penalty: $0.00
Issuance Date: 11/26/2019
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 03/30/2020
Gravity: 10
Report ID: 0626600
Contest Date: 12/20/2019
Final Order: 03/30/2020
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/30/2020 | $0.00 | 03/30/2020 | Serious | |
Penalty | C: Contested | 01/06/2020 | $5,304.00 | 12/16/2019 | Serious | |
Penalty | Z: Issued | 11/26/2019 | $5,304.00 | 12/16/2019 | Serious |
Text For Citation: 01 Item/Group: 001C Hazard:
29 CFR 1910.333(b)(2): While an employee was exposed to contact with parts of fixed electric equipment or circuits which were deenergized, the circuits energizing the parts were not locked out or tagged or both in accordance with the requirements of this paragraph (b) of 29 CFR 1910.333(b)(2): On or about October 22, 2019, and times prior thereto, throughout the apartment complex where employees were exposed to electrical shock hazards when removing and replacing energized 240 VAC air conditioning electrical disconnects without deenergized circuits being locked out.