Violation Detail
Standard Cited: 19100107 G02 Spray finishing using flammable and combustible materials.
Inspection Nr: 1434554.015
Citation: 01001C
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/07/2020
Nr Instances: 1
Nr Exposed: 3
Abatement Date:
Gravity: 5
Report ID: 0317300
Contest Date:
Final Order: 05/15/2020
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/15/2020 | $0.00 | Serious | ||
Penalty | Z: Issued | 04/07/2020 | $0.00 | Serious |
Text For Citation: 01 Item/Group: 001C Hazard:
29 CFR 1910.107(g)(2): All spraying areas were not kept as free from the accumulation of deposits of combustible residues as practical, with cleaning conducted daily if necessary: a) Paint spraying/mixing room - On or about October 8, 2019, the employers failed to ensure that all spray areas were kept free from accumulation of residual paint. In the spray painting/mixing room an accumulation of over spray was observed on the walls, floors and equipment used.