Violation Detail
Standard Cited: 19101000 E Air contaminants.
Inspection Nr: 1388500.015
Citation: 01001C
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/26/2019
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 12/16/2019
Gravity: 10
Report ID: 0317500
Contest Date:
Final Order: 08/12/2019
Related Event Code (REC): R
Emphasis:
Substance: 1840
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | P: Petition to Mod Abatement | 11/01/2019 | $0.00 | 12/16/2019 | Serious | |
Penalty | I: Informal Settlement | 08/12/2019 | $0.00 | 09/23/2019 | Serious | |
Penalty | Z: Issued | 07/26/2019 | $0.00 | 08/21/2019 | Serious |
Text For Citation: 01 Item/Group: 001C Hazard:
29 CFR 1910.1000(e): Feasible administrative or engineering controls were not determined and implemented to achieve compliance with the limits prescribed in 29 CFR 1910.1000(a) through (d): a) In the T-1 Shop, on or about May 1, 2019 - The employer failed to use feasible engineering and administrative controls to reduce a Burner's exopsure to nickel, metal and insoluble compounds (as Ni) below the permissible exposure limit while he used an ESAB Powercut 1250 plasma cutter and abrasive disc to split panels overlayed with Inconel.