Violation Detail
Standard Cited: 19100147 D02 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1373591.015
Citation: 01001C
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,282.00
Current Penalty: $0.00
Issuance Date: 03/11/2019
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 03/29/2019
Gravity: 10
Report ID: 0522500
Contest Date:
Final Order: 04/04/2019
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/04/2019 | $0.00 | 03/29/2019 | Serious | |
| Penalty | Z: Issued | 03/11/2019 | $9,282.00 | 03/29/2019 | Serious |
Text For Citation: 01 Item/Group: 001C Hazard:
29 CFR 1910.147(d)(2): Machine or equipment shutdown. The machine or equipment shall be turned off or shut down using the procedures established for the machine or equipment. An orderly shutdown must be utilized to avoid any additional or increased hazard(s) to employees as a result of the equipment stoppage. a. On or before January 17, 2019, where employees changed out the tooling on a Peddiworker 1050 hydraulic power press, the press was not turned off or shut down using established procedures, thereby exposing employees to a caught-in hazard.