Violation Detail
Standard Cited: 19100219 C04 I Mechanical power-transmission apparatus.
Inspection Nr: 1359292.015
Citation: 01001C
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,293.00
Current Penalty: $0.00
Issuance Date: 02/20/2019
Nr Instances: 2
Nr Exposed: 1
Abatement Date: 03/04/2019
Gravity: 5
Report ID: 0626600
Contest Date:
Final Order: 03/29/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/29/2019 | $0.00 | 03/04/2019 | Serious | |
Penalty | Z: Issued | 02/20/2019 | $7,293.00 | 03/04/2019 | Serious |
Text For Citation: 01 Item/Group: 001C Hazard:
29 CFR 1910.219(c)(4)(i): Unguarded projecting shaft end(s) did not present a smooth edge and end and projected more than one half the diameter of the shaft: On or about November 8, 2018 on the cube line, the unguarded shaft ends of the conveyor motor drive projected more than one half the diameter of the shaft.