Violation Detail
Standard Cited: 19100184 E03 I Slings.
Inspection Nr: 1347224.015
Citation: 01001C
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $9,054.00
Current Penalty: $0.00
Issuance Date: 10/18/2018
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity: 10
Report ID: 0111700
Contest Date:
Final Order: 11/14/2018
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/14/2018 | $0.00 | Serious | ||
| Penalty | Z: Issued | 10/18/2018 | $9,054.00 | Serious |
Text For Citation: 01 Item/Group: 001C Hazard:
29 CFR 1910.184(e)(3)(i): In addition to the inspection required by paragraph (d) of this section, a thorough periodic inspection of alloy steel chain slings in use were not made on a regular basis for (B) Severity of service conditions and (C) Nature of lifts being made: Shop - A periodic inspection of the alloy steel chain sling in use was not conducted to ensure proper use.
Translate