Violation Detail
Standard Cited: 19100146 E01 Permit-required confined spaces
Inspection Nr: 1344064.015
Citation: 01001C
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 12/14/2018
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 01/04/2019
Gravity:
Report ID: 0830600
Contest Date:
Final Order: 01/10/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/10/2019 | $0.00 | 01/04/2019 | Other | |
Penalty | Z: Issued | 12/14/2018 | $0.00 | 01/04/2019 | Serious |
Text For Citation: 01 Item/Group: 001C Hazard:
29 CFR 1910.146(e)(1): Before entry was authorized, the employer did not document the completion of measures required by 29 CFR 1910.146(d)(3) by preparing an entry permit: a) On or about August 14, 2018, and at times prior, the employer, Tolin Mechanical Systems Company, did not ensure an entry permit was prepared so as to document the completion of measures and to determine if entry conditions were acceptable before employees were required to enter the permit space. Abatement Note: Abatement certification and documentation are required for this item (see enclosed Sample Abatement-Certification Letter).