Violation Detail
Standard Cited: 19100219 C04 II Mechanical power-transmission apparatus.
Inspection Nr: 1341247.015
Citation: 01001C
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 12/21/2018
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 01/23/2019
Gravity: 5
Report ID: 0521100
Contest Date:
Final Order: 01/10/2019
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 01/10/2019 | $0.00 | 01/23/2019 | Serious | |
| Penalty | Z: Issued | 12/21/2018 | $0.00 | 01/23/2019 | Serious |
Text For Citation: 01 Item/Group: 001C Hazard:
29 CFR 1910.219(c)(4)(ii): Unused keyways shall be filled up or covered. On or about August 22, 2018, employees of Bonduelle working in the Repack Building on the Cob Corn Wrapping Line were exposed to a rotating shaft end which had a keyway that was not filled in or covered.