Violation Detail
Standard Cited: 19100147 D04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1285525.015
Citation: 01001C
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/24/2018
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 06/20/2018
Gravity: 10
Report ID: 0213900
Contest Date: 09/06/2018
Final Order: 01/30/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 01/30/2019 | $0.00 | 06/20/2018 | Serious | |
Penalty | C: Contested | 09/10/2018 | $0.00 | 06/20/2018 | Serious | |
Penalty | Z: Issued | 05/24/2018 | $0.00 | 06/20/2018 | Serious |
Text For Citation: 01 Item/Group: 001C Hazard:
29 CFR 1910.147(d)(4)(i): Lockout or tagout devices were not affixed to each energy isolating device by authorized employees: a) JVK Operations, Ltd. - Washer extractor press area: Lockout or Tagout devices had not been affixed to each energy source of the Washing tunnels and Washer extractor press machines by an authorized employee prior to an employee placing their body inside the point of operations while performing unjamming operations on those machines, on or about 12/19/2017.