Violation Detail
Standard Cited: 19260416 A03 General requirements.
Inspection Nr: 1258237.015
Citation: 01001C
Citation Type: Serious
Abatement Date: 01/26/2018 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 01/04/2018
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 10
Report ID: 0627700
Contest Date:
Final Order: 01/26/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/26/2018 | $0.00 | 01/26/2018 | Serious | |
Penalty | Z: Issued | 01/04/2018 | $0.00 | 01/26/2018 | Serious |
Text For Citation: 01 Item/Group: 001C Hazard:
29 CFR 1926.416(a)(3): Before work began the employer did not ascertain by inquiry, direct observation, or by instruments, whether any part of an energized electric power circuit, exposed or concealed, was so located that the performance of the work could bring a person, tool, or machine into physical or electrical contact with the energized electric power circuit. On or about July 5, 2017, and times prior thereto, before work began the employer had not determined whether any part of an energized electric power circuit could come into physical contact with subcontractor employees who were permitted to work in a demolition/construction area. This exposed subcontractor employees who were involved with data cable work to electric shock.