Violation Detail
Standard Cited: 19100147 D01 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1217806.015
Citation: 01001C
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,408.00
Current Penalty: $0.00
Issuance Date: 09/01/2017
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 10/13/2017
Gravity: 10
Report ID: 0523300
Contest Date:
Final Order: 09/28/2017
Related Event Code (REC): A;R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/28/2017 | $0.00 | 10/13/2017 | Serious | |
| Penalty | Z: Issued | 09/01/2017 | $11,408.00 | 09/12/2017 | Serious |
Text For Citation: 01 Item/Group: 001C Hazard:
29 CFR 1910.147(d)(1): Preparation for shutdown. Before an authorized or affected employee turns off a machine or equipment, the authorized employee shall have knowledge of the type and magnitude of the energy, the hazards of the energy to be controlled, and the method or means to control the energy. On or about March 10, 2017, employee(s) did not utilize energy control procedures during servicing and/or maintenance activities of the BOBBIO-CNC-1400 in the F-60 department. The list of these activities includes, but is not limited to, maintaining set up and replacing an arbor.
Translate