Violation Detail
Standard Cited: 19260452 C02 Additional requirements applicable to specific types of scaffolds.
Inspection Nr: 1203691.015
Citation: 01001C
Citation Type: Serious
Abatement Date: 03/10/2017 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 02/06/2017
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC):
Gravity: 5
Report ID: 0627500
Contest Date:
Final Order: 03/01/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/01/2017 | $0.00 | 03/10/2017 | Serious | |
Penalty | Z: Issued | 02/06/2017 | $0.00 | 02/24/2017 | Serious |
Text For Citation: 01 Item/Group: 001C Hazard:
29 CFR 1926.452(c)(2): Frames and panels were not braced by cross, horizontal, or diagonal braces, or combination thereof, which secure vertical members together laterally, and automatically square and align the vertical members so that the erected scaffold is always plumb, level, and square. On or about January 18, 2017 the employer did not ensure that scaffolding used for plastering operations were plumb, level, square, and braced to prevent swaying and displacement. This condition exposed employees to fall hazards above 10 feet.