Violation Detail
Standard Cited: 19100147 D02 The control of hazardous energy (lockout/tagout).
Inspection Nr: 116140757
Citation: 01001C
Citation Type: Serious
Abatement Status: X
Initial Penalty:
Current Penalty:
Issuance Date: 05/22/2000
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 07/10/2000
Gravity: 10
Report ID: 0112000
Contest Date: 06/16/2000
Final Order: 02/12/2001
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 02/12/2001 | 07/10/2000 | Serious | ||
Penalty | Z: Issued | 05/22/2000 | 07/10/2000 | Serious |