Violation Detail
Standard Cited: 19260651 H01 Specific Excavation Requirements.
Inspection Nr: 987991.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 01/26/2015
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 03/20/2015
Gravity: 10
Report ID: 0830400
Contest Date: 02/17/2015
Final Order: 04/30/2015
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 04/30/2015 | $0.00 | 03/20/2015 | Serious | |
Penalty | C: Contested | 02/17/2015 | $0.00 | 01/29/2015 | Serious | |
Penalty | Z: Issued | 01/26/2015 | $0.00 | 01/29/2015 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1926.651(h)(1): Employees were working in excavations in which there was accumulated water, or excavations in which water was accumulating, and adequate precautions had not been taken to protect employees against the hazards posed by water accumulation: (a) On or about July 28, 2014, for an employee exposed to cave-in hazards while installing a concrete storm sewer in an unprotected trench approximately ten feet deep in the vicinity of Columbia Street and East Willow Street in Harrisburg, South Dakota.