Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 983013.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $0.00
Issuance Date: 12/22/2014
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 01/25/2015
Gravity: 10
Report ID: 0625500
Contest Date:
Final Order: 01/12/2015
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 01/12/2015 | $0.00 | 01/25/2015 | Serious | |
| Penalty | Z: Issued | 12/22/2014 | $7,000.00 | 01/25/2015 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: Bldg 151, Room 1.310: On or about June 25, 2014 an employee was exposed to a struck by hazard from a port (flange) collar that was being removed from a constant volume combustion chamber while still under pressure.
Translate