Violation Detail
Standard Cited: 19100119 F01 I G Process safety management of highly hazardous chemicals.
Inspection Nr: 954037.015
Citation: 01001B
Citation Type: Serious
Abatement Date: 06/04/2014 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/17/2014
Nr Instances: 1
Nr Exposed: 70
Related Event Code (REC):
Gravity: 5
Report ID: 0419400
Contest Date: 05/09/2014
Final Order: 03/06/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/06/2015 | $0.00 | 06/04/2014 | Serious | |
Penalty | C: Contested | 06/27/2014 | $0.00 | 06/04/2014 | Serious | |
Penalty | Z: Issued | 04/17/2014 | $0.00 | 06/04/2014 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.119(f)(1)(i)(G): The employer did not develop and implement wirtten operating procedures that shall address -Startup following a turnaround, or after an emergency shutdown: (a) Plant 80 - On or about November 15,2013 Chevron did not effectively implement the F-8007 start up procedure.