Standard Cited: 19100120 Q02 II Hazardous waste operations and emergency response.
This violation item has been deleted.
Inspection Nr: 945558.015
Citation: 01001B
Citation Type: Serious
Abatement Date: 04/29/2014 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/23/2014
Nr Instances: 1
Nr Exposed: 7
Related Event Code (REC): C
Gravity: 10
Report ID: 0523400
Contest Date: 05/08/2014
Final Order: 04/08/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 04/08/2015 | $0.00 | 04/29/2014 | Serious | |
Penalty | F: Formal Settlement | 04/08/2015 | $0.00 | 04/29/2014 | Serious | |
Penalty | C: Contested | 05/09/2014 | $0.00 | 04/29/2014 | Serious | |
Penalty | C: Contested | 05/09/2014 | $0.00 | 04/29/2014 | Serious | |
Penalty | Z: Issued | 04/23/2014 | $0.00 | 04/29/2014 | Serious | |
Penalty | Z: Issued | 04/23/2014 | $0.00 | 04/29/2014 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.120(q)(2)(viii): The emergency response plan did not address, to the extent not addressed elsewhere, emergency medical treatment and first aid: a) On or about October 30th, 2013, four First Response Team employees sought their own medical treatment after responding and cleaning up a phosphoric/sulfuric acid spill that occurred in the Monel EP area. The Emergency Response and Contingency Plan did not address the emergency medical treatment and first aid for memebers of the First Response Team with injuries from chemical spill response. 29 CFR 1910.120(q)(2)(ii): The emergency response plan did not address, to the extent not addressed elsewhere, personnel roles, lines of authority, and communication: a) The Emergency Response and Contingency Plan did not address the roles of the First Response Team members and how to maintaining a line of authority during a chemical spill response.