Violation Detail
Standard Cited: 19100119 D03 I D Process safety management of highly hazardous chemicals.
Inspection Nr: 909370.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 11/27/2013
Nr Instances: 1
Nr Exposed: 70
Abatement Date: 12/31/2014
Gravity: 10
Report ID: 0112000
Contest Date: 12/18/2013
Final Order: 12/17/2014
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 12/17/2014 | $0.00 | 12/31/2014 | Serious | |
| Penalty | C: Contested | 12/18/2013 | $0.00 | 03/03/2014 | Serious | |
| Penalty | Z: Issued | 11/27/2013 | $0.00 | 03/03/2014 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.119(d)(3)(i)(D): The employer did not include, in the process safety information compilation, the relief system design and the design basis: A. On or about May 31, 2013, Facility: The process safety information maintained by the employer did not include information on the relief system design basis for the two Fisher H282-250 Series Large Internal Spring Relief Valves installed on the isopentane vessel and the two Corken B166 pressure relief valves.