Violation Detail
Standard Cited: 19100268 J03 Telecommunications.
This violation item has been deleted.
Inspection Nr: 897800.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Not Completed - Solicitor Advised
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/18/2013
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 11/01/2013
Gravity: 10
Report ID: 0112300
Contest Date: 11/05/2013
Final Order: 05/05/2014
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 10/22/2014 | $0.00 | 11/01/2013 | Serious | |
Penalty | F: Formal Settlement | 05/05/2014 | $0.00 | 11/01/2013 | Serious | |
Penalty | Z: Issued | 09/18/2013 | $0.00 | 11/01/2013 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.268(j)(3): A vehicle-mounted bucket was operated closer to energized overhead powerlines than that set forth in Table R-2 of this section: At the site on 688 Alton Carolina Road, Charlestown RI: The employer did not ensure approach distances to overhead powerlines conformed to the safe working distances according to Table R-2 of this section. An employee was electrocuted when he maneuvered his bucket into the restricted approach distances in table R-2.