Violation Detail
Standard Cited: 19100147 C04 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 852424.015
Citation: 01001B
Citation Type: Serious
Abatement Date: 11/12/2013 2
Initial Penalty: $7,000.00
Current Penalty: $7,000.00
Issuance Date: 06/20/2013
Nr Instances: 1
Nr Exposed: 6
Related Event Code (REC): A
Gravity: 10
Report ID: 0625500
Contest Date:
Final Order: 07/16/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/16/2013 | $7,000.00 | 11/12/2013 | Serious | |
Penalty | Z: Issued | 06/20/2013 | $7,000.00 | 07/25/2013 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.147(c)(4)(ii): Procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, 29 CFR 1910.147(c)(4)(ii)(A), (c)(4)(ii)(B), (c)(4)(ii)(C) and (c)(4)(ii)(D): On or about January 28, 2013, in the Stamping Department, the Aida 300 ton press model numbers PMX-L2-300(1), where the written energy control procedure did not specifically identify all energy sources, such as gravitational energy, for employees engaged in the performance of servicing and/or maintenance activities.