Violation Detail
Standard Cited: 19260451 C01 General requirements.
Inspection Nr: 663518.015
Citation: 01001B
Citation Type: Other
Abatement Date: 03/27/2013 2
Initial Penalty: $4,500.00
Current Penalty: $0.00
Issuance Date: 03/15/2013
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity:
Report ID: 0215000
Contest Date: 04/24/2013
Final Order: 03/10/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/10/2014 | $0.00 | 03/27/2013 | Other | |
Penalty | C: Contested | 04/29/2013 | $4,500.00 | 03/27/2013 | Serious | |
Penalty | Z: Issued | 03/15/2013 | $4,500.00 | 03/27/2013 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1926.451(c)(1): Supported scaffolds with a height to base width (including outrigger supports, if used) ratio of more than four to one (4:1) shall be restrained from tipping by guying, tying, bracing, or equivalent means, as follows: Location: 42 West Street, Brooklyn, NY. 5th level roof elevator shaft. a) The 4 section high tubular welded frame scaffolds were not restrained from tipping by guying, tying or equivalent means. Employees used the tubular welded frame scaffolds to construct the bulkhead on the roof and it was not restrained by any means. On or about 09/18/2012. NOTE: THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT CERTIFICATION FOR THIS ITEM. FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY of 1,000.00, IN ACCORDANCE WITH 29 CFR 1903.19