Powered by GoogleTranslate

Violation Detail

Standard Cited: 19260451 G04 I General requirements.

Inspection Nr: 423123.015

Citation: 01001B

Citation Type: Serious

Abatement Status: Not Completed - Worksite Changed

Initial Penalty: $0.00

Current Penalty: $0.00

Issuance Date: 10/29/2012

Nr Instances: 2

Nr Exposed: 5

Abatement Date: 10/30/2012

Gravity: 10

Report ID: 0317000

Contest Date:

Final Order: 11/15/2012

Related Event Code (REC): V

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty I: Informal Settlement 11/15/2012 $0.00 10/30/2012 Serious  
Penalty Z: Issued 10/29/2012 $0.00 10/30/2012 Serious  

Text For Citation: 01 Item/Group: 001B Hazard:

29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along all open sides and ends of platforms. Guardrail systems shall be installed before the scaffold is released for use by employees other than erection/dismantling crews. a) Jobsite - 2000 Parrish Street - Employees working on the tubular welded scaffold were exposed to fall hazards up to approximately 30 feet as a guardrail system was not installed on the end of the platform. Employees were working on the outrigger section of the 5th level of the scaffold on or about 4/30/12.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.