Violation Detail
Standard Cited: 19100119 L05 Process safety management of highly hazardous chemicals.
Inspection Nr: 314427378
Citation: 01001B
Citation Type: Serious
Abatement Status: X
Initial Penalty:
Current Penalty:
Issuance Date: 11/04/2010
Nr Instances: 1
Nr Exposed: 7
Abatement Date: 11/30/2010
Gravity: 10
Report ID: 0418600
Contest Date: 12/02/2010
Final Order: 04/26/2011
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 04/26/2011 | 11/30/2010 | Serious | ||
| Penalty | Z: Issued | 11/04/2010 | 11/30/2010 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard: CHEMNEP
29 CFR 1910.119(l)(5): A change covered by 29 CFR 1910.119(l) resulted in a change in the operating procedures or practices required by 29 CFR 1910.119(f), and such procedures or practices were not updated: a)In the Reduction area: On or about June 7, 2010 and at times prior the employer changed the operating procedure for Reactor Assembly (WIR112) from installing all CVD reactor flange bolts and tightening and connecting all hoses to installing 6 to 8 bolts and hand tightening then starting the drying and leak check procedure (WIR120) and did not update the written operating procedure.