Violation Detail
Standard Cited: 19260850 A Preparatory operations.
This violation item has been deleted.
Inspection Nr: 191135.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 03/20/2012
Nr Instances:
Nr Exposed: 3
Abatement Date: 04/04/2012
Gravity:
Report ID: 0522300
Contest Date:
Final Order: 03/30/2012
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/30/2012 | $0.00 | 04/04/2012 | Serious | |
| Penalty | Z: Issued | 03/20/2012 | $0.00 | 04/04/2012 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1926.850(a): Prior to permitting employees to start demolition operations, an engineering survey shall be made, by a competent person, of the structure to determine the condition of the framing, floors, and walls, and possibility of unplanned collapse of any portion of the structure. Any adjacent structure where employees may be exposed shall also be similarly checked. The employer shall have in writing evidence that such a survey has been performed: An engineering survey of the area under renovation and the surrounding areas was not performed prior to the beginning of demolition operations.
Translate