Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1831160.015
Citation: 01001B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/14/2025
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 10/10/2025
Gravity: 1
Report ID: 0111100
Contest Date:
Final Order: 07/28/2025
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/28/2025 | $0.00 | 10/10/2025 | Serious | |
| Penalty | Z: Issued | 07/14/2025 | $0.00 | 10/10/2025 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard were being followed: Planer Building - Employer did not conduct an annual inspection of the energy control procedures and the requirements of this standard.