Violation Detail
Standard Cited: 19260651 B03 Specific Excavation Requirements.
Inspection Nr: 1817754.015
Citation: 01001B
Citation Type: Serious
Abatement Status:
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/11/2025
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 09/05/2025
Gravity: 10
Report ID: 0524200
Contest Date: 09/09/2025
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | C: Contested | 09/24/2025 | $0.00 | 09/05/2025 | Serious | |
| Penalty | Z: Issued | 08/11/2025 | $0.00 | 09/05/2025 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1926.651(b)(3): When excavation operations approach the estimated location of underground installations, the exact location of the installations was not determined by safe and acceptable means: a) On or about April 10, 2025, employees were exposed to electrical shock while using conductive tools to locate energized underground electrical lines with a voltage of 12KV. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.